post https://infragrid.v.network/wallet/updatesetting
Update the consume_user_resource_percent parameter of a smart contract
Origin Energy Limit
Starting with Java-Vision Odyssey 3.2 release, this parameter is required for deploying new contracts, and the value should be larger than 0. For contracts already deployed on the Mainnet prior to Odyssey 3.2, the value is stored as 0, but treated as maximum = 10,000,000.